TM 9-6115-668-13
1.
Set MASTER LOAD switch on load bank to OFF.
2. Open AC Circuit Interrupter on generator set.
3.
After a 36-second cool down, turn BLOWER/CONTROL POWER switch on load bank to OFF.
4.
Set all remaining switches on the load bank to OFF.
5.
Set all switches on the EPP-III/EPU junction box to OFF.
6. Shut down generator set.
7.
Disconnect load bank cables L1, L2, L3, L0 and generator power and control cables from EPP III/EPU junction
box. Disconnect all ground cables.
5-238
Change 1