TM 9-6115-668-135.13SPEED GOVERNOR ASSEMBLY N1 MAINTENANCE.This task covers:a. Removalb. Adjustmentc. installationGeneral Mechanics Tool Kit(item 2, appendix B)Automotive Fuel and Electrical System Repair, Tool Kit(item 3, appendix B)Load bank (item 19, appendix B)XY-printer(item 16, appendix B)ReferenceGenerator Set 150 kW shutdownparagraph 2.5.2Cable ties(item 10, appendix E)WARNINGDisconnect the negative battery cable first and then the positive battery termi-nal cables. Failure to observe this warning could result in severe personal injuryor death.Tag all cables prior to removal to ensure correct connection of the cables duringinstallation.1. Open flap (2, figure 5-27) on unit hood assembly (1).2. Open front panel (4) on control cabinet assembly (3) and secure with prop (5).NOTESpeed governor assembly N1 (43) Is located behind digital isochronous loadsharing module N4 (33).3.Remove two nuts (32), two serrated Iock washers (32) and two washers (34) from two standoffs (35), while holdingstandoffs (35).4. Swing digital isochronous load sharing module N4 (36) to one side.5. Record labeling and position of cables (42) and remove cables (42) from terminals (44) of speed governorassembly N1 (43).6 . Remove resistor R10 (41) from speed governor assembly N1 (43) and set aside for re-use.7. Remove cables (54) for resistors R100 to R102 from connection strip (53).5-117
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business