TM 9-6115-668-13Figure 5-25 Digital lsochronous Load Sharing Module N4, Location of Potentiometers and Test Points.NOTEPerform the ADJUSTMENT procedure when installing a new digital isochrono-us load sharing module N4 (34).1. Place digital isochronous load sharing module N4 (36) on standoffs (35.37).2. install two nuts (32), two serrated lock washers (33) and two washers (34) on standoffs (35) while holding standoff(35) with a suitable wrench.3.install cables to terminals of digital isochronous load sharing module N4 (36). Note correct labeling and position.4.Install housing cover (31) on module (36) and tighten nuts (29, 30).5. Install washer (25), line (21), washer (24), serrated lock washer (23), and nut (22) on threaded pin.6. Install cable tie holder (26) with screw (28) and serrated lock washer (27), while holding standoff with a suitablewrench; arrange cables and secure with cable ties.7. Install two serrated lock washers (39), two washers (38), and two screws (40) on two standoffs (37) while holdingstandoffs (37) with a suitable wrench.8. Stow prop (5) and dose front panel (4).9. Close flap (2).5-114
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business