TM 9-9115-668-134.14UNIT HOOD ASSEMBLY MAINTENANCE.This task covers:a. Removalb. InstallationINITIAL SETUPToolsEquipmentConditionsGeneral Mechanic’s Tool Kit(item 2, appendix B)Automotive Fuel and Electrical System Repair, Tool Kit(item 3, appendix B)Sling/Hoisting Device, Universal(item 7, appendix B)ReferenceGenerator Set 150 kW shutdown,paragraph 2.5.2Materials/PartsPersonnel RequiredLubricant(item 6, appendix E)Two - ThreeREMOVAL1Remove six bolts (25, figure 4-25) six lock washers (26) and six washers (27) from connectionpanel case (30).2.3.Remove attachment rail (28) and rubber cover (29).Remove ten bolts (22) ten serrated lock washers (23) and ten washers (24) from connection panelcase (30).4.5.Remove connection panel case (30) with seal and protection profile out of unit hood (1).Using a 19 mm wrench, loosen six lock nuts (18) six eye bolts (14) six nuts (17) six washers (16),and six plates (15).6.Lift six plates (15) out of retainers (13) and fold down six eye bolts (14) six nuts (17) six washers(16) and six plates (15).7.Remove nut (6) serrated lock washer (7) washers (9, 10), and ground strap (8) from stud (11) onbase frame (12). Install washer (9, 10), serrated lock washer (7) and nut (6) on stud (11) to preventloss of hardware.8.Open flap (36) and loosen two band clamps (37) on rubber fuel fill hose (38).This procedure requires a minimum of two personnelStay clear of the suspended load. Failure to observe this warningcould result In severe personal injury or death.Change 1 4-45
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business