ItemNo.313233TM 9-6115-662-13&PTable 2-2. Operator Preventive Maintenance Checks and Servicesfor AN/MJQ-40, PU-803, and PU-804 (continued)LocationNot Fully MissionIntervalItem to Check/ServiceProcedureCapable if:WARNINGNEVER attempt to start the generator set when it is not properly grounded.BeforeBeforeBeforePersonal injury or death due toGENERATOR SETContinuedGROUND ROD CABLE ANDCONNECTIONSINPUT LOAD ANDPARALLELING CABLESOUTPUT CONNECTORSelectrocution could result.Inspect ground rod and cable forCable is missing orloose connections, breaks, damage, damaged.and corrosion.Ensure cables are properlyCables areinstalled. Inspect for damage and improperly installed,cutting.or damaged.Inspect output connectors formissing hardware or damage.2-23
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business