TM 9-6115-660-13&P1-5 REPORTING EQUIPMENT IMPROVEMENT RECOMMENDATION (EIR). _If your power plant or power unit needs improvement, let us know. Send us an EIR. You, the user, are the only one whocan tell us what you don’t like about your equipment. Let us know why you don’t like the design or performance. Put it onSF 368 (Product Quality Deficiency Report). Mail it to us at Commander, U.S. Army Aviation and Troop Command,ATTN: AMSAT-I-MDO, 4300 Goodfellow Boulevard, St. Louis, MO 63120-1798. We will send you a reply.1-6 NOMENCLATURE CROSS-REFERENCELIST.Refer to table 1-1 for nomenclature cross-reference list.Table 1-1. Nomenclature Cross-Reference ListCommon NameOfficial NomenclatureAN/MJQ-37Power Plant, Diesel Engine Driven, 1 1/2 Ton Trailer Mounted, 10 kW, 60 HzAN/MJQ-38Power Plant, Diesel Engine Driven, 1 1/2 Ton Trailer Mounted, 10 kW, 400 HzPU-798Power Unit, Diesel Engine Driven, 1 Ton Trailer Mounted, 10 kW, 60 HzPU-799Power Unit, Diesel Engine Driven, 1 Ton Trailer Mounted, 10 kW, 400 HzPU-798APower Unit, Diesel Engine Driven, High Mobility Trailer Mounted, 10 kW, 60 HzPU-799APower Unit, Diesel Engine Driven, High Mobility Trailer Mounted, 10 kW, 400 HzMEP-803AGenerator Set, 10 kW, 60 HzMEP-813AGenerator Set, 10 kW, 400 HzM103A3Chassis, Trailer: 1 1/2 Ton, 2 Wheel (altered)M116A3Chassis, Trailer: 1 Ton, 2 Wheel (altered)HMTChassis, Trailer: High Mobility, 2 Wheel (altered)1-7 LIST OF ABBREVIATIONS/ACRONYMS.Refer to the glossary at the back of this manual.1-8 GLOSSARY.Refer to the glossary at the back of this manual.Change 2 1-4
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business