Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
INSTALLATION - TM-9-6115-659-13P_183
Figure 5-14. Relay Board Harness Assembly W11 Removal.
TM-9-6115-659-13P Power Unit PU-732/M (NSN 6115-00-280-3082) MEP-118A 15 Kw 400 Hz Generator Set M200A1 2-Wheel 4-Tire Modified Trailer Manual
Page Navigation
152
153
154
155
156
157
158
159
160
161
162
TM 9-6115-659-13&P
5-9
RELAY
BOARD HARNESS W11 MAINTENANCE
This task covers:
a.
TEST
c.
Repair
b.
Removal
d.
Installation
INITIAL
SETUP
Tools
Equipment
Conditions
General Mechanics Tool Hit
Reference
(item 1, appendix B)
Solder
Gun (item 3, appendix B)
Both
generator
sets shut down; paragraph
Crimping Tool, Hand (item 3, appendix B)
25.&3. Trailer handbrakes set, front support
Multimeter
(item 3, appendix B)
leg/landing lowered, and rear
leveling
-support
jack lowered; paragraph 2-3.2. Switch box
Material/Parts
cover open.
Solder
Lock washers
TEST
1.
Remove four screws (1, figure 514),
lock washers
(2), and flat was(3), and invert relay board assembly (4).
2.
Refer to
wiring diagram
(figure FO-1) and table 5-2, and perform
continuity
check of relay board harness W11.
Table 5-2.
Relay
Board Harness Wire
List
WIRE NO.
FROM
TO
WIRE NO.
FROM
TO
W11-1
XK3-2
TB1-1
W11-19
R1-1
TB1-17
W11-2
XK3-3
TB1-6
W11-20
XK6-3
TB1-12
W11-3
XK3-4
TB1-5
W11-21
XK6-4
TB1-11
W11-4
XK3-5
TB1-3
W11-22
XK6-5
TB1-16
W11-5
XK3-6
TB1-4
W11-23
XK6-6
TB1-13
W11-6
XK3-7
TB1-2
W11-24
XK6-7
TB-15
W11-7
XK5-2
TB1-1
W11-25
R1-2
E6
W11-8
XK5-3
TB1-8
W11-26
R2-2
E3
W11-9
XK5-4
TB-10
W11-27
E5
TB1-1
W11-10
XK5-5
TB1-17
W11-28
E4
TB1-2
W11-11
XK5-6
TB1-6
W11-29
R2-1
TB1-16
W11-12
E-7
E-6
W11-30
E2
TB1-15
W11-13
XK4-2
TB1-14
W11-31
E1
E4
W11-14
XK4-3
TB1-9
W1142
XK5-7
TB1-2
W11-15
XK4-4
TB1-5
W1133
E1
TB1-14
W11-16
XK4-5
TB1-3
W11-34
E8
TB1-18
W11-17
XK4-6
TB1-7
W11-35
XK6-2
TB1-14
W11-18
XK4-7
TB1-15
W11-36
E9
E3
Change 3 5-24
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business