TM 9-6115-659-13&P
5-9 RELAY BOARD HARNESS W11 MAINTENANCE
This task covers:
a.
TEST
c.
Repair
b.
Removal
d.
Installation
INITIAL SETUP
Tools
Equipment Conditions
General Mechanics Tool Hit
Reference
(item 1, appendix B)
Solder Gun (item 3, appendix B)
Both generator sets shut down; paragraph
Crimping Tool, Hand (item 3, appendix B)
25.&3. Trailer handbrakes set, front support
Multimeter (item 3, appendix B)
leg/landing lowered, and rear leveling-support
jack lowered; paragraph 2-3.2. Switch box
Material/Parts
cover open.
Solder
Lock washers
TEST
1.
Remove four screws (1, figure 514), lock washers (2), and flat was(3), and invert relay board assembly (4).
2.
Refer to wiring diagram (figure FO-1) and table 5-2, and perform continuity check of relay board harness W11.
Table 5-2. Relay Board Harness Wire List
WIRE NO.
FROM
TO
WIRE NO.
FROM
TO
W11-1
XK3-2
TB1-1
W11-19
R1-1
TB1-17
W11-2
XK3-3
TB1-6
W11-20
XK6-3
TB1-12
W11-3
XK3-4
TB1-5
W11-21
XK6-4
TB1-11
W11-4
XK3-5
TB1-3
W11-22
XK6-5
TB1-16
W11-5
XK3-6
TB1-4
W11-23
XK6-6
TB1-13
W11-6
XK3-7
TB1-2
W11-24
XK6-7
TB-15
W11-7
XK5-2
TB1-1
W11-25
R1-2
E6
W11-8
XK5-3
TB1-8
W11-26
R2-2
E3
W11-9
XK5-4
TB-10
W11-27
E5
TB1-1
W11-10
XK5-5
TB1-17
W11-28
E4
TB1-2
W11-11
XK5-6
TB1-6
W11-29
R2-1
TB1-16
W11-12
E-7
E-6
W11-30
E2
TB1-15
W11-13
XK4-2
TB1-14
W11-31
E1
E4
W11-14
XK4-3
TB1-9
W1142
XK5-7
TB1-2
W11-15
XK4-4
TB1-5
W1133
E1
TB1-14
W11-16
XK4-5
TB1-3
W11-34
E8
TB1-18
W11-17
XK4-6
TB1-7
W11-35
XK6-2
TB1-14
W11-18
XK4-7
TB1-15
W11-36
E9
E3
Change 3 5-24