TM 9-6115-659-13&P
6. Refer to table 5-1 and tag and disconnect all W9 wires from terminal board TB1 and TB2.
7. Refer to table 5-1 and wiring diagram (figure FO-1), and tag and disconnect all W9 wires from
switches S1, S2, and S10; indicator light housings XDS1 through XDS7; and permissive paralleling
relay PP.
8. Remove switch box wiring harness W9 from switch box.
Refer to figure G3, appendix G.
INSTALLATION
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Position harness in switch box.
Using figures 5-8 and figure FO-1 as a reference, connect wires to switches S1, S2, and S10; indicator
light housings XDS1-XDS7; and permissive paralleling relay PP.
Refer to table 5-1 and connect all W9 leads to terminal boards TB-1 and TB-2.
Position relay board (4, figure 5-13) and install four flat washers (3), lock washers (2), and screws (1).
Install W9 harness leads (3, figure 5-12), internal tooth washer (2), and nut (1) on load terminals L0
and L3 (4).
Place insulation sleeving on leads W9-20 and W9-49 and solder leads to resistor R3.
Slide sleeving over solder joint and heat shrink.
Refer to table 5-1 and install W9 wires (7, figure 5-11), flat washers (6), lock washers (5), and nuts (4)
on contactor terminals (9).
Refer to table 5-1 and install W9 leads (12) on terminals (13) using screws (11).
Install contactor shield (3), two lock washers (2), and screws (1) over contactor terminals A2, B2,
and C2.
5-23