TM 9-6115-658-13&P 4-3 4-1.3 DeprocessingUnpackedEquipment.Refer to DA Form 2258, Depreservation Guide for Vehicles and Equipment, packed with the power plant. The depreservation guide explains what was done to the equipment prior to packaging. It also explains what has to be done before placing the equipment in operation. Perform all depreservation actions required by the depreservation guide. 4-2 INSTALLATION INSTRUCTIONS. 4-2.1 Tools,TestEquipment,andMaterialsRequiredforInstallation.A general mechanic's tool kit is required for installation of the power plant. 4-2.2 AssemblyofEquipment.4-2.2.1 AssemblyofPowerPlantsAN/MJQ-42andAN/MJQ-43.Refer to Figure 4-1 and assemble the AN/MJQ-42 and AN/MJQ-43 Power Plants as follows: NOTE AN/MJQ-42 is illustrated in Figure 4-1. Installation of power cables on AN/MJQ-43 is identical. a. Open load terminal access door (1, Figure 4-1). b. Connect power cable W1-1 (W1-4 for AN/MJQ-42) leads (3) to generator set load terminals (2) as follows: (1) Connect lead marked L1 to generator set load terminal L1. (2) Connect lead marked L2 to generator set load terminal L2. (3) Connect lead marked N to generator set load terminal N. (4) Connect lead marked GND to generator set GND terminal. c. Position cable (3) inside two clamps (5) and secure clamps (5) to trailer using two screws (4), flat washers (6) lock washers (7), and nuts (8). d. Repeat steps a. through c. for rear generator set. e. unscrew nut (10). f. Position ground cable (11) through ground stud (9). Ensure ground stud nut is properly secured creating a good ground. Failure to observe this warning could result in severe personal injury or death. g. Tighten nut (10). WARNING
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business