TM 9-6115-658-13&P
4-8
Figure 4-3. Unit PMCS Routing Diagram.
Table 4-1. Unit Preventive Maintenance Checks and Services
ITEM
NO.
INTERVAL
ITEM TO BE
CHECKED OR
SERVICED
PROCEDURE
NOT FULLY
MISSION
CAPABLE IF:
Before performing any maintenance that requires climbing on
or under trailer, make sure that trailer handbrakes are set,
trailer front landing leg/support leg is lowered, and leveling-
support jack is lowered. Injury to personnel could result from
trailer suddenly rolling or tipping.
1
Semi-
Annually
POWER CABLES
Inspect power cables for worn, frayed,
or cracked insulation, loose terminal lugs,
and loose connections. Tighten as
needed.
Power cable is
unserviceable.
2
Semi-
Annually
SWITCH BOX
ASSEMBLY
Inspect switch box assembly (refer to
paragraph 4-13).
3
Semi-
Annually
MOUNTING RAILS
Inspect for cracks and deformation.
Mounting rail is
cracked or
deformed.
4
Semi-
Annually
FIRE
EXTINGUISHER
a. Inspect for broken seal and damage to
handle.
b. Weigh to determine whether charge is
sufficient. Weight is 13 pounds when
fully charged. If weight is 12.5 pounds
or less, send to specialized activity for
recharging.
Fire extinguisher not
charged.
WARNING