TM 9-6115-658-13&P 4-13 Section VI. MAINTENANCE PROCEDURES 4-10 MAINTENANCE OF GENERATOR SETS. Refer to generator TM 9-6115-639-24. 4-11 MAINTENANCE OF TRAILERS. Refer to TM 9-2330-202-14&P. 4-12 CABLE, POWER MAINTENANCE. This task covers: a. Test c. Installation b. Removal INITIALSETUPToolsEquipmentConditionsTool Kit, General Mechanic's Reference (item 1, Appendix B) Both generator sets shut down; paragraph Multimeter2-5.3.3. Make sure generator sets are shut down before performing any electrical maintenance. Failure to observe this warning could result in severe personal injury or death. TEST1. Release two clamping catches (11, Figure 4-7) and open switch box cover (1). 2. Disconnect power cable to be tested from generator set load terminals. NOTE Cable leads L1, L2 terminate in switch box at contactor K1 for Generator 1 (front) and contactor K2 for Generator 2 (rear). N and Ground leads terminate at switch box load terminals. 3. Use multimeter to check continuity of each electrical lead in power cable. Each lead should have continuity between bare end of conductor at generator set load terminal and terminal lug (9). Check for continuity between lead marked ground and switch box ground load terminal, lead marked N and switch box N load terminal, lead marked L1 and contactor terminal 1, lead marked L2 and contactor terminal 1. If no continuity, notify next higher level of maintenance. WARNING
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business