TM 9-6115-604-34NAVFAC P-8-633-34(50)Reconnect the EMERGENCY SHUTDOWN cable to the engine emergency manual shut off valve andsecure-the cable to the engine in accordance with paragraph 4-51 of the Operator and OrganizationalMaintenance Manual.(51)Reconnect the fuel lines to the fuel filters, fuel return port on the cylinder block, and damps holding thelines to the engine in accordance with paragraphs 4-47 and 4-48 of the Operator and OrganizationalMaintenance Manual.(52)Reconnect the ether installation to the engine in accordance with paragraph 4-50 of the Operator andOrganizational Maintenance Manual.(53)Reconnect the coolant preheater hoses to the water pump and cylinder head (coolant transfer tubes) inaccordance with paragraph 4-61 of the Operator and Organizational Maintenance Manual.(54)Reconnect the radiator hoses to the water pump, thermostat housings, and aftercooler in accordance withparagraphs 4-54, 4-55, and 4-57 of the Operator and Organizational Maintenance Manual.(55)Reconnect the hoses to the crankcase breathers.(56)Reconnect the oil drain valve and hose to the oil pan in accordance with paragraph 4-67 of the Operatorand Organizational Maintenance Manual.(57)Reconnect the oil prelube hoses and bypass filter hose to the engine block, and oil pan in accordance withparagraphs 4-65 and 4-71 of the Operator and Organizational Maintenance Manual.(58)Fill the cooling and lubrication systems in accordance with paragraphs 3-3 and 3-12 of the Operator andOrganizational Maintenance Manual.(59)Install the batteries in accordance with paragraph 3-9 of the Operator and Organizational MaintenanceManual.(60)Reconnect cable from UTILITY POWER receptacle and remove safety tag.(61)Set maintenance lockout switch to OPERATE and remove safety tag.(62)Install load cables and remove and discard tags.2-16. GENERATOR G1 REMOVAL AND INSTALLATIONa.Remove. The generator is removed by lifting it through the top of the generator set. An overhead crane or hoistrated for 6.000 pounds (2,722 kg) should be used. Minimum height clearance needed for lifting the generatorfree of the generator set is 150 inches (3810 mm).(1)Disconnect load cables from output terminals, place on safety stands and tag output terminal to ensuregenerator set is not connected to load bus during generator removal.(2)Set maintenance lockout switch to MAINTENANCE and safety tag.(3)Disconnect cable from UTILITY POWER receptacle and safety tag UTILITY POWER receptacle to ensurecable is not connected during generator removal.(4)Remove batteries in accordance with paragraph 3-9 of the Operator and Organizational MaintenanceManual.(5)Remove the conduit box cover assembly from the conduit box assembly. See Figure 2-7. Removehexagon head capscrews (5, Figure 2-8) and lockwashers (6) securing generator cable exit endosure (4) togenerator cabinet.(6)Remove the cover from the rear of cabinet B. See Figure 2-12 and paragraph 4-18 of the Operator andOrganizational Maintenance Manual.(7)Disconnect the generator power leads (1, Figure 2-13) from the terminal posts (2) on the back of the loadcircuit breaker CB101 receptacles.(8)Disconnect the generator ground leads (3) from the insulated standoff (4).NOTEBefore moving the generator power leads, generator ground leads, or wiring harness, thetiewraps which fasten them to other wiring must be removed.2-38
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business