Item
No.
1
2
3
ARMY TM 9-6115-464-12
AIR FORCE TO 35C2-3-445-1
NAVY NAVFAC P-8-624-12
Table 5-5. Operator Preventive Maintenance Checks and Services For Electric
Interval
Before
Before
Before
Location
Item to
Check/
Service
Power
Cable
Coolant Line
Valves
Generator
Set Radiator
Winterization Kit
Procedure
Check that power is connected to power supply before
operation.
Check that all coolant line valves are in the proper
position for operation.
Check for proper coolant level (para 327).
Not Mission
Capable If:
5-23