ARMY TM 9-6115-464-12
AIR FORCE TO 35C2-3-445-1
NAVY NAVFAC P-8-624-12
Item
No.
4
5
6
5-24
Table 5-5. Operator Preventive Maintenance Checks and Services For Electric
Interval
Before
Before
During
Winterization Kit - Continued
Location
Item to
Check/
Service
Coolant
Lines
Control
Assembly
Coolant
Lines
Procedure
Check coolant lines for leaks before operation. Inspect
condition and tighten connections quarterly (para 55).
Check for damage and test indicator lights (para 5-13).
Check coolant lines for leaks during operation.
Not Mission
Capable If: