ARMY TM 5-6115-633-14&P
(1) Removal.
(a)
Untie 25 ropes (1, figure 3-1) fastening fitted cover to trailer body (2).
Unfasten six straps and buckles (3) securing rear curtain (4). Roll up curtain, and
(b)
secure with three rollup straps (5) provided.
(c)
Unfasten six straps and buckles (3) securing front curtain (6). Roll up curtain, and
secure with three rollup straps (5) provided.
Roll up each side (7) of fitted cover, in turn, and secure each side with six rollup straps
(d)
(5) provided.
Working under fitted cover (1, figure 3-2), unfasten 12 straps (2) securing fitted
(e)
cover to bow assemblies (3). Remove fitted cover.
(2) Installation.
NOTE
Front curtain is provided with three tie-down ropes. Rear curtain only has two
ropes.
(a) Position fitted cover (1, figure 3-2) on top of bows (3) making certain front of fitted
cover is at front of trailer.
Figure 3-1. Fitted Cover Installed on Power Plant.
3-19