• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3-1. Fitted Cover Installed on Power Plant.
Figure 33. Bow Assembly Replacement.

Power Plant An/Mjq-18 (Nsn 6115-00-033-1398) (2) Mep-003A 10Kw 60Hz Generator Sets M103A3 2-Wheel, 1-1/2 Ton Modified Trailer Page Navigation
  22    23    24    25    26  27  28    29    30    31    32  
img
. . . .
ARMY TM 5-6115-633-14&P
Figure 32. Fitted Cover Rolled Up for Removal.
(b) Secure fitted cover (1, figure 3-2) to bow assembly (3) with 12 straps (2) provided.
(c) Unfasten rollup straps (5, figure 3-1) securing sides of fitted cover and lower both sides (7).
(d) Unfasten rollup straps (5) securing front and rear curtains (4, 6) and lower both curtains.
(e) Secure front and rear curtains (4, 6) to sides (7) with six straps and buckles (3) provided on each curtain.
(f) Secure fitted cover to trailer body (2) with 25 ropes (1) provided.
b. B o w A s s e mbly Repla cement. (See figure 33.)
(1) R e m o v a l .
(a) Remove fitted cover (paragraph 3-11, a.(t)).
(b) Remove two quick release pins (1) securing each bow assembly (2) in pockets (3) on trailer body(4). Lift
each bow out of pocket and off trailer body.
Change
2
3-20


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.