ARMY TM 5-6115-633-14&P
Table 3-2. Operator/Crew Preventive Maintenance Checks and Services (PMCS) - CONT.
W Weekly
M - Monthly
A - After
D During
B - Before
Item to be inspected.
Procedure: check for and
Interval
Equipment is not
have repaired, filled, or
Item
ready/available if:
adjusted as needed
no.
21
INSTRUMENTS CONT
c. Check that current meter (28) reading
does not exceed 100% or more than 5%
load difference between phases.
Desired voltage can-
d.
not be obtained and
desired output voltage as deter-
maintained.
mined by load connections and amps-
volts transfer switch.
Oil pressure drops
Check engine oil pressure gage (30)
e.
for 20 to 45 psig indication.
below 20 psig.
3-14