• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 3-2. Operator/Crew Preventive Maintenance Checks and Services (PMCS) - Continued
Table 3-2. Operator/Crew Preventive Maintenance Checks and Services (PMCS) - Continued

Power Plant An/Mjq-18 (Nsn 6115-00-033-1398) (2) Mep-003A 10Kw 60Hz Generator Sets M103A3 2-Wheel, 1-1/2 Ton Modified Trailer Page Navigation
  14    15    16    17    18  19  20    21    22    23    24  
img
ARMY TM 5-6115-633-14&P
Table 3-2. Operator/Crew Preventive Maintenance Checks and Services (PMCS) - CONT.
B - Before
D During
A After
W Weekly
M Monthly
Item to be inspected.
Interval
Procedure: check for and
Item
have repaired, filled, or
Equipment is not
no.
adjusted as needed
ready/available if:
17
SUPPORT LEG ASSEMBLY
With trailer connected to towing vehi-
Support leg assembly
cle, check support leg assembly (24)
is seized.
for ease of operation.
18
REAR LEG PROP ASSEMBLY
Inspect leg prop assembly (25) for
Leg prop assembly is
broken or missing parts.
unserviceable.
3-12


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.