TM 5-6115-585-12NAVFAC P-8-623-12TO 35C2-3-455-1TM-05682C/05685B-12(c)Apply adhesive backed teflon tape to leftsupport assembly top surface (slotted surface which mountsagainst underside of skid).Use hand pressure to remove airbubbles.(d) Clear tape from slotted openings.(3) Right Support Assembly (refer to figure 5-8,item 3).(a)Wipe surface clean.(b) Cut a 61 in. length of adhesive backed teflontape from supplied bulk material.(c)Apply adhesive backed teflon tape to rightsupport assembly top surface (slotted surface which mountsagainst underside of skid).Use hand pressure to remove airbubbles.(d) Clear tape from slotted openings.(4)Side Closure Assembly (refer to figure 5-4,item 13).(a)Wipe surface clean.(b) Cut a 20 1/2 in. length and a 29 1/4 in.length of adhesive backed teflon tape from supplied bulkmaterial.(c)Apply adhesive backed teflon tape to topedges (edges with four holes) and left edge (edge with threeholes).Use hand pressure to remove air bubbles.(d) Clear tape from holes.(5) Rear Closure Assembly (refer to figure 5-10,item 6).(a)Wipe surface clean.(b) Cut a 23 in. length and a 14 in. length ofadhesive backed teflon tape from supplied bulk material.(c)Apply adhesive backed teflon tape to top edge(edge with three holes) and right edge (edge with two holes whichcontacts right panel assembly).Use hand pressure to remove airbubbles.(d) Clear tape from holes.5-26Change 8
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business