(7) Check end play of the crankshaft using a dialindicator.Tap crankshaft with a soft-headed hammerin one direction to take up slack or end play. Afterdial indicator is set in place, force crankshaft with apry bar in opposite direction to obtain end play read-ing. The end play is 0.007 to 0.013 inch. The endplay is controlled by thrust flanges at the center mainbearing. If end play is not within the allowable range,replace thrust flanges.Thrust flanges are availablein standard thickness (0. 126 to 0. 127 inch) and 0.005,0.010, and 0. 015 inch oversize.(8) Install piston and connecting rod assembly.(para 14-83.)(9) Install crankshaft gear and timing gearhousing. (para 14-75.)(10) Install flywheel housing. (para 14-70.)(11) Install oil pump and oil pan. (para 14-67.)(12) Install crankshaft pulley and vibrationdampener. (para 14-63.)(13) Refer to Operator and OrganizationalMaintenance Manual and install electric starter,winterization kits (if installed), manifolds, turbo-charger, radiator and housing.c. Camshaft beari ng installation.(1) Position new bearing so that oil hole inbearing lines up with oil hole in cylinder block.(2) Front bearing must be installed so that bear-ing end is flush with or below front side of cylinderblock.(3) The rear and intermediate bearings are alike.The rear bearing should be installed with the bearingend flush with the front side of the cylinder block bear-ing bore.NOTEWhen a new camshaft rear bearing is installedin place, the old rear bearing will remain partlyin the cylinder block.Use a punch and collapsethe old bearing, preferably at the seam, andremove the old bearing with pliers.(4) Install remaining bearings.(5) Install cylinder sleeve. (Refer to step a.above.)(6) Install cylinder head and valve operatingmechanism.(para 14-79.)(7) Install crankshaft. (Refer to step b. above.)(8) Install piston and connecting rod assemblies.(para 14-83.)(9) Install timing gears and housing. (para14-75.)(10) Install flywheel and housing. (para 14-70.)(11) Install oil pump and oil pan. (para 14-65.)(12) Refer to Operator and OrganizationalMaintenance Manual and install valve cover, manifolds.turbocharger, radiator, electric starter and housing.d. OilPressureRegulating ValveInstallationandAdjustment.(1) Thoroughly clean valve bore in cylinderblock, lubricate valve piston with clean oil and installthe regulating valve components in the reverse orderof removal.(2) Turn valve adjusting screw into cylinderblock the same number of turns required for removal.(3) With the engine re-installed in the generatorset, start the engine and allow it to reach normaloperating temperature.Adjust oil pressure regula-tion screw to obtain oil pressure of 45 psi. No furtheradjustment should be necessary.e. OilPressureR egulatingValveRemoval.Remove oil pressure regulating valve in the order ofsequence numbers (items 31-36, figure 14-41,sheet 3).(1) Thoroughly clean the area around the cylin-der block where the pressure regulating valve is lo-cated.(2) Loosen jam nut.(3) Remove regulating valve screw,ber of turns required for removal.(4) Withdraw the spacer, spring andnoting num-piston.f. Oil Pressure Regulating Valve CleaningInspectionandRepair.(1) Wash valve parts in cleaning solvent and in-spect carefully for wear or damage.(2) Inspect the valve seat in the cylinder blockand clean if necessary.(3) Replace any necessary parts.14-96 Change 8
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business