d.Connect 120 Vac 60 Hz power supply to term-inals 4 and 12 of the control box relay assembly.Measure voltage at terminals 6 and 10. Voltageshould be 120 Vac (fig. 1-1).e.Measure dc voltage across relay K6. Voltageshould be above 18 Vdc (fig. 1-1).3-11. Control Cubicle Wiring Harness.Rebuild wiring harness if inspection reveals 30 per-cent or more defective wires. Wiring harness re-building instructions are described in Chapter 5.Otherwise replace damaged wires.3-12. Control Cubicle Reassembly, Testing andInstallation.a.Reassembly. Refer to Operator and Organi-zational Maintenance Manual and reassemble thecontrol cubicle.b.Testing.Refer to the Operator and Organi-zational Maintenance Manual (Control cubicle,s thematic diagram) to test the assembled controlcubicle.(1) The following control cubicle componenttests are described in paragraphs 3-6 through 3-10respectively:Ac WattmeterConverterAc AmmeterFrequency meter and transducerControl box relays(2) Wiringtest.( a ) Using an ohmmeter, check the wiringfrom each-pin of receptacle J1 to the last point ofits connection.( b ) Where the wiring of two or more pinsof the receptacle can be tested by a switch closure,close the switch and complete the teat. After com-pleting the test, return the a switch to its normalposition.(3) Oilpressuregagetest.( a ) Connect the positive lead of a variabledc power supply, adjusted for 28.5 Vdc, to pin smallw of receptacle J1.( b ) Connect the negative lead of the powersupply via a 0-50 ohm 100 watt potentiometer ad-justed for 15 ohms to pin V or receptacle J1.( c ) Turn on the power supply and wait 3minutes.( d ) After 3 minutes have elapsed, the oilpressure gage should indicate 60 psi.( e ) Turn off the power supply and disconnectthe test circuit.(4) WaterTemperaturegagetest.( a ) Connect the positive lead of a variablevoltage dc power supply, adjusted for 28.5 Vdc, topin small w of receptacle J1.( b ) Connect the negative lead of the powersupply via a 0-2K ohm S watt potentiometer adjustedfor 917 ohms, to pin W of receptacle J1.( c ) Turn on the power supply and wait 3minutes.( d ) After 3 minutes have elapsed, the watertemperatike gage should indicate 180 degrees F.( e ) Turn off the power supply and disconnectthe test circuit.(5) FuelLevelgagetest.( a ) Connect the positive lead of a variablevoltage dc power supply adjusted for 28.5 Vdc, topin small w of receptacle J1.( b ) Connect the negative lead of the powersupply via a 0-50 ohm 100 watt potentiometer adjust-ed for 15 ohms to pin X of receptacle J1.( c ) Turn on the prover supply and wait 3minutes.( d ) After 3 minutes have elapsed, the fuellevel indicator should indicate one-half tank( e ) Turn off the power supply and disconnectthe test circuit.(6) TotalTimeindicatortest.(8) Connect the positve lead of a variablevoltage dc power supply adjusted for 28.5 Vdc , topin small w of receptacle Jl.( b ) Connect the negative lead of the powerreapply to pin small r of receptacle J1.( c ) Turn on the power supply.( d ) Observe the tenths column of the indica-tors digital read out.( e ) The indicadicator shall display one-tenthafter six finutes of operation.(f) Turn off the power supply and removethe test leads.3-7
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business