Figure 2-2. Generator Removal
i. On precise sets, install the governor control
unit and mounting bracket in reverse order of re-
moval (fig. 7-1).
j. See figure 6-3 and install current trans-
former assembly in reverse order of removal.
k. See figure 6-2 and thread generator output
cables through current transformers in reverse
order of removal. Connect 18 tagged harness wires
to terminal strip on transformer assembly.
l. Refer to the Operator and Organizational
Maintenance Manual and install the following:
(1) Air cleaner.
(2) Reconnection board.
(3) Load terminal board.
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
Main load contactor.
Rear roof and corner posts.
Rear panels and doors.
Rear grill.
Control cubicle.
Fault indicator.
Manual speed control.
Receptacle panels (as required).