3-13. (Deleted)3-14. Plate and Sleeve Assembly Inspection.Inspect plate and sleeve assembly (fig. 3-15) fortears, dents and other damage.3-15. Paralleling Receptacles Inspection.Inspect the paralleling receptacles (fig. 3-16) forloose electrical connection, loose mounting, bentpins, cracks, breaks, corrosion, and other damage.Inspect the connector leads for broken or frayedinsulation and other damage.3-16. DC Circuit Breaker Inspection and FaultIndicator Lamp Test.Inspect DC CONTROL CIRCUIT BREAKER (27, fig.3-17) for loose mounting, loose electrical connec-tions, or damage and check lamp operation asfollows:a.Close DC CONTROL CIRCUIT BREAKER(fig. 2-5).b.Set START-RUN-STOP switch to RUN,c.Set and hold fault indicator TEST OR RESETswitch to test and check that all fault indicatorslight.b.Set START-RUN-STOP switch to RUN.c.Set and hold fault indicator TEST OR RESETswitch to test and check that all fault indicatorslight.3-17. AC Voltmeter.a.Inspection.Inspect ac voltmeter (42, fig. 3-18)for cracks, breaks, corroded and/or loose terminals,and other damage.b.Adjustment.With generator off, adjust volt-meter zero control until the pointer is at zero.3-18. Kilowatt Meter.a.Inspection.Inspect kilowatt meter (39, fig.3-18) for cracks, breaks, corroded and/or looseterminals, and other damage.b.Adjustment.With generator off, adjust kilo-watt meter zero control until pointer is at zero.Change 13-19. AC Ammeter.a.Inspection.Inspect ac ammeter (8, fig. 3-18)for cracks, breaks, corroded and/or loose terminals,and other damage.b.Adjustment.With generator off, adjust acammeter zero control until pointer is at zero.3-20. Frequency Meter.Inspect freq meter (7, fig. 3-18) for cracks, breaks,loose and/or corroded terminals, and other damage.3-21. Control Cubicle Panel Switches Inspection.Inspect switches on the control cubicle panel (96,fig. 3-18), for cracks, breaks, corroded terminals,loose electrical connections, loose mounting, andother damage.3-22. Control Cubicle Panel Gages Inspection.Inspect gages on the control cubicle panel (96, fig.3-18), for cracks, breaks, corroded terminals,loose electrical connection, loose mounting, andother damage.3-23. Running Time Meter Inspection.Inspect RUNNING TIME meter on the control cubiclepanel (96, fig. 3-18), for cracks, breaks, corrodedterminals, loose electrical connections, loosemounting, and other damage.3-24. Battery Charge Ammeter Inspection.Inspect BATTERY CHG AMMETER (77, fig. 3-18)on the control cubicle panel for cracks, breaks,corroded terminals, loose electrical connections,loose mounting, and other damage.3-25. Panel Light Assemblies.a. Inspection.—(1) Inspect lens (17, fig. 3-18) for cracks,breaks, loose mounting.looseb.—lamp.(2) Inspect lamp (24, fig. 3-18) for breaks ormounting.TestandReplacement.(1) Close DC circuit breaker.(2) Set PANEL LIGHT switch to ON position.(3) If any panel lamps do not light, replace3-26. Press-to-Test Light Assemblies.a. Inspection.—(1) Inspect lens (26 and 33, fig. 3-18) for cracks,breaks, loose mounting.3 - 1 2
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business