TM 9-6115-668-13
4.85 OIL OUTLET PIPE ASSEMBLY MAINTENANCE.
This task covers:
a. Removal
b. Installation
Tools
Equipment Conditions
General Mechanics Tool Kit
(item 2, appendix B)
Automotive Fuel and Electrical System Repair, Tool Kit
(item 3, appendix B)
Materials/Parts
Reference
Generator Set 150 kW shut
down,
paragraph 2.5.2
Sealing rings
Sealing tape
(item 19, appendix E)
1.
2.
3.
4.
Open flap (2, figure 4-65) on unit hood assembly (1).
Unscrew collar nut (21), remove VELCRO strap and oil outlet pipe assembly (21 to 29) from scav-
enge pump (6).
Using a suitable hold clamp shutoff valve (26), unscrew hose nipple (29) and remove together with
sealing rings (28, 27) from shutoff valve (26). Discard sealing rings (27, 28).
Remove hose nipple (23) and remove together with sealing rings (25, 24) and oil line (22) from
shutoff valve (26). Discard sealing rings (25, 24).
1.
Using a suitable hold clamp shutoff valve (26), insert new sealing rings (25, 24) into shutoff valve
(26) and screw in hose nipple (23) of oil line (22).
2.
Insert new sealing rings (27, 28) into shutoff valve (26) and screw in hose nipple (29).
3.
Install oil outlet pipe assembly (21 to 29) on scavenge pump (6) and screw on collar nut (21).
4.
Coil up oil outlet pipe assembly (21 to 29) and secure with VELCRO Strap.
5. Close flap (2).
4-212