TM 9-6115-662-13&P5-7 SWITCH BOX ASSEMBLY MAINTENANCE.This task covers: a. Replacementb. TestINITIALSETUPToolsEquipmentConditionsTool Kit, General Mechanic’s(item 1, appendix B)ReferenceMultimeter, AN/PSM-45 (item 2, appendix B)Both generator sets shut down, para 2-5.3.1.Trailer support devices areMaterials/Partslowered, paragraph 2-3.2.1.Washers, LockREPLACEMENTRefer to paragraph 4-12 to remove and install switch box assembly.TEST1. Disassemble switch box assembly for test as follows:a.b.c.Remove 21 screws (1, figure 5-11), flat washers (3), and lock washers (2) that secure the switch boxcover (4) to the switch box assembly.CAUTIONThe control panel connector P3 is connected to connector J4. Movement of the switch boxcover is limited. To prevent damage to control panel wiring harness, use cautionremoving switch box cover. Failure to observe this caution can result in equipmentdamage.Carefully position switch box cover (4) in front of switch box.Disconnect P3 (8) from J4 (11) and set switch box cover (4) out of the way.2. Remove two lamps for Unit A and two lamps for Unit B from switch box control panel.5-15
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business