TM 9-6115-660-13&P2-3.4.2 Power Unit. Connect load cables to generator set load terminals. Refer to operating instructions in TM 9-6115-642-10.2-3.5 Positioning of Fire Extinguishers. Remove fire extinguisher(s) from bracket(s) on trailer. Locate fireextinguisher(s) on ground away from power plant/power unit.2-4 INITIAL ADJUSTMENTS, CHECKS, AND SELF TEST.Refer to table 2-2 and perform all "Before" PMCS. Refer to TM 9-6115-642-10 and perform generator set initialadjustments, checks, and self tests.2-5 OPERATING PROCEDURES.2-5.1 Generator Set Operating Procedures. Refer to TM 9-6115-642-10.2-5.2 Trailer Operating Procedures. Refer to TM 9-2330-202-14&P for Power Units PU-798 and PU-799, TM 9-2330-392-14&P for PU-798A and PU-799A, and TM 9-2330-213-147P for Power Plants AN/MJQ-37 and AN/MJQ-38.2-5.3 Power Plant Switch Box Operating Procedures.2-5.3.1 Operating a Single Generator Set.a.Perform the Preventive Maintenance Checks and Services (PMCS) listed as "Before" in table 2-2.b.Check that both ON/OFF switches (4 and 6, figure 2-9) on switch box are at center position.c.Check that TRANSFER switch (5) on switch box is at bottom position.Figure 2-9. Power Plant Operation.Change 2 2-35
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business