2-3.4 Connecting Load.
2-4 INITIAL ADJUSTMENTS, CHECKS, AND SELF TEST. - TM-9-6115-660-13P_69
TM-9-6115-660-13P Power Plant Diesel Engine Driven 1-Ton Trailer Mounted (With Racks) 3Kw 60 Hz AN/MJQ-42 Manual
Page Navigation
38
39
40
41
42
43
44
45
46
47
48
TM 9-6115-660-13&P
Figure 2-8. Switch Box Load
Cable Connections
.
Table 2-3. Load Terminal Voltage.
Generator
Terminals
Phase
Voltage
Output
Reading
120/208V 3PH
L1, L2
L1 - L2 3 PHASE
208 VOLTS
L3, L0
L2 - L3 3 PHASE
208 VOLTS
L3 - L1 3 PHASE
208 VOLTS
L3 - L0 3 PHASE
120 VOLTS
120V 1PH
L3 -L0
L3 - L0 1 PHASE
120 VOLTS
120/240V 1PH
L3 - L1
L3 - L1 1 PHASE
240 VOLTS
L3 - L0
L3 - L0 1 PHASE
120 VOLTS
OR
L1 - L0
L1 -L0 1 PHASE
120 VOLTS
c.
d.
e.
Using load terminal box wrench located in accessory box, loosen terminal nuts (5) on
terminals (3) selected in step b.
Insert ends of cables into slots of load terminal studs (3).
Tighten load terminal nuts (5).
2-34