INSTALLATION1.2.3.4.5.Position new loadprovided.TM 9-6115-660-13&Pterminal (8, figure 4-17 sheet 1) on mounting plate so that alignment pin fits in holeInstall and tighten the hex nut (6).Install the leads (5).Install internal tooth lock washer (4) and thread hex nut (3) on load terminal (8) and tighten.Close switch box terminal cover (1) and switch box cover (2), and secure with clamping catches(11 and 12).4-18 LOAD TERMINAL COVER MAINTENANCE.This task covers: a. Removalb. InstallationINITIALSETUPToolsEquipmentConditionsTool Kit, General Mechanic’s(item 1, appendix B)ReferenceBoth generator sets shut down, para 2-5.3.3.Materials/PartsNoneREMOVAL1. Release clamping catches (1, figure 4-18) and open switch box cover (2).2. Release clamping catches (3) and open load terminal cover (4).3. Remove six nuts (5), lock washers (6), screws (7), and flat washers (8) and remove load terminal cover(4) and stop (9) from switch box (10).NOTEIf replacing load terminal cover, step 4 must be performed.4. Remove four rivets (11) and two clamping catch strikes (12). Retain strikes for installation on newcover.INSTALLATION1. Install load terminal cover (4) and stop (9), on switch box (10) with six screws (7), flat washers (8), lockwashers (6), and nuts (5).4-37
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business