TM 9-6115-659-13&P
2.
Unsolder diode (15) from stud terminal (14) and remove diode.
INSTALLATION
1.
Refer to wiring diagram (figure FO-1) and solder diode leads to terminal studs (14) as applicable.
2.
Invert relay board assembly (4) and install four flat washers (3), lock washers (2), and screws (1).
5-16.1 PU-797A AND AN/MJQ-35A FLOOR AND FENDER MAINTENANCE.
This task covers:
a. Removal
c. Installation
b. Repair
INITIAL SETUP
Tools
Tool Kit, General Mechanics
(item 1, appendix B)
Rivet Gun (item 8, appendix B)
Materials/Parts
Rivets, (items 6 and 7, appendix I)
Equipment Conditions
Reference
Generator set shut down; paragraph 2-5.3.3.
Trailer handbrakes set, front support
leg/landing lowered, and rear leveling-support
jacks lowered; paragraph 2-3.2.1.
Generator sets removed as required
(AN/MJQ-35A); paragraph 5-6
Switch Box assembly removed (AN/MJQ-35A
roadside fender only); paragraph 4-13.
REMOVAL
1.
Floors.
NOTE
PU-797A and AN/MJQ-35A trailers have center and side floors or platforms riveted to the
trailer. The side floors are in two sections.
Remove rivets (1, figure 5-20.1) and floor sections (2) from trailer chassis (3).
2.
Fenders.
a.
If necessary, remove the following.
(1)
Data plate (paragraph 4-22).
(2)
Fire extinguisher and bracket (paragraph 4-20).