TM 9-6115-659-13&P
INSTALLATION
1.
Position new load terminal (8) on mounting plate so that alignment pin fits in hole provided.
2.
Install and tighten the hex nut (6).
3.
Install the leads (5).
4.
Install internal tooth lock washer (4) and thread hex nut (3) on load terminal (8) and tighten.
5.
Close switch box terminal cover (1) and switch box cover (2), and secure with clamping catches
(11 and 12).
4-18 LOAD TERMINAL COVER MAINTENANCE.
This task covers: a. Removal
b. Installation
INITIAL SETUP
Tools
Equipment Conditions
Tool Kit, General Mechanics
Reference
(item 1, appendix B)
Both generator sets shut down, para 2-5.3.3.
Materials/Parts
None
REMOVAL
1. Release clamping catches (1, figure 4-18) and open switch box cover (2).
2. Release clamping catches (3) and open load terminal cover (4).
3. Remove six nuts (5), lock washers (6), screws (7), and flat washers (8) and remove load terminal cover
(4) and stop (9) from switch box (10).
NOTE
If replacing load terminal cover, step 4 must be performed.
4. Remove four rivets (11) and two clamping catch strikes (12). Retain strikes for installation on new
cover.
INSTALLATION
1. Install load terminal cover (4) and stop (9) on switch box (10) with six screws (7), flat washers (8), lock
washers (6), and nuts (5).
4-38