TM 9-6115-658-13&P
2-21
Section III. OPERATION UNDER USUAL CONDITIONS
2-3
ASSEMBLY AND PREPARATION FOR USE.
2-3.1 Assembly of the Power Plants. Assembly must be performed by unit level maintenance personnel.
2-3.2 Installation Instructions. Before the power plant is started and operated, it is towed to the worksite and
positioned.
2-3.2.1 Positioning the Power Plant.
a. Locate the trailer on as level a surface as possible. This is necessary for efficient operation of
the generator set(s).
Do not disconnect trailer from towing vehicle before brakes are set and
front landing leg/support leg is lowered. Failure to observe this warning
could result in severe personal injury or death from trailer tipping or
rolling.
b. Using the two handbrake levers, set trailer brakes securely to prevent any movement.
c. Refer to TM 9-2330-202-14&P for uncoupling trailer from towing vehicle.
d. Adjust rear support leveling leg used to level the trailer.
e. Pull out pin (1, Figure 2-3) that secures rear leveling-support jack (2) in travel position.
Figure 2-3. Jack, Leveling-Support.
WARNING
![](//www.tpub.com/assessment.jpg)