5-11 RELAY, PERMISSIVE PARALLELING MAINTENANCE.
This task covers:
a.
Removal
c. Installation
b.
Test
INITIAL SETUP
Tools
Equipment Conditions
Tool Kit, General Mechanic's
Reference
(item 1, Appendix B)
Multimeter
Both generator sets shut down; paragraph
Power Oscillator, 50-420 Hz
2-5.3.3. Trailer handbrakes set, front support
leg/landing lowered, and rear leveling-support
jack lowered; paragraph 2-3.2.1. Switch box
Materials/Parts
cover open.
Lock washers
Figure 5-8. Relay, Permissive Paralleling Maintenance.