TM 9-6115-658-13&P
5-7
5-8 RAILS, MOUNTING REPLACEMENT.
This task covers:
a.
Removal
b. Installation
INITIAL SETUP
Tools
Equipment Conditions
Tool Kit, General Mechanics
Reference
(item 1, Appendix B)
Trailer handbrakes set, front support
Materials/Parts
leg/landing leg lowered, and rear
Leveling-support jack lowered; paragraph
Nuts, Self-locking
2-3.2.1.
Both generator sets shut down; paragraph
2-5.3.3.
REMOVAL
Remove sixteen self-locking nuts (4, Figure 5-2), thirty-two flat washers (3), sixteen bolts (1), and two mounting
rails (2).
INSTALLATION
Install two mounting rails (2), sixteen bolts (1), thirty-two flat washers (3), and sixteen self-locking nuts (4).
Figure 5-2. Replace Rails, Mounting.