TM 9-6115-658-13&P 5-4Section III. MAINTENANCE PROCEDURES 5-5 GENERAL. This section covers Direct Support level maintenance procedures for power plant components that are not covered in the generator set technical manual, or trailer technical manuals. 5-5.1 GeneratorSetMaintenance.Refer to generator set TM 9-6115-639-13. 5-5.2 TrailerChassisMaintenance.Refer to TM 9-2330-202-14&P. 5-6 GENERATOR, 3kW, SET REPLACEMENT. This task covers: a. Removal b. Installation INITIALSETUPToolsEquipmentConditionsTool Kit, General Mechanic's Reference (item 1, Appendix B) Torque Wrench, o-150 ft-lb Trailer handbrakes set, front support leg/landing leg lowered, and rear Lifting Device,750lbs. Lifting capacity leveling-support jack lowered; paragraph 2-3.2.1. Materials/PartsCables removed paragraph 2-7.2 Both generator sets shut down; paragraph Nuts, Self-locking 2-5.3.3. REMOVALNOTE Procedure for removal and installation of generator set is the same for both power plants. 1. Remove four self-locking nuts (1, Figure 5-1), four flat washers (2), four bolts (4). 2. Attach a four-leg sling to the four lifting rings at the sides of the generator set (3). The sling must meet the dimension requirements shown on the generator set lifting and tiedown diagram plate.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business