REPLACE THE SKID BASE ASSEMBLY
INSTALLATION - TM-5-6115-634-14P_216
TM-5-6115-634-14P Power Plant AN/MJQ-16 (NSN 6115-00-033-1395) (2) MEP-002A 5 Kw 60 Hz Generator Sets M103A3 2-Wheel 2-Tire Modified Trailer Manual
Page Navigation
185
186
187
188
189
190
191
192
193
194
195
TM5-6115-634-14&P
NAVFAC P-8-647-14&P
T0-35C2-3-445-14
TM-6115-14&P/1
MAINTENANCE OF
JUNCTION BOX
6-7. JUNCTION BOX REPAIR
This task covers: a. Removal
b. Installation
INITIAL SETUP
Tools
General Mechanic’s Tool Kit
5180-00-177-7033
Materials/Parts
Housing, Junction Box
97403-13228E1935
Cover, Enclosure
97403-13228E1936
Wiring Harness, Control
97403-13228E1933
Wiring Harness, Power
97403-13228E1934
REMOVAL
1.
PLACE
JUNCTION BOX
ASSEMBLY ON A
CLEAN FLAT SURFACE.
2.
REMOVE ENCLOSURE COVER.
a.
Remove 16 screws (1), washers
(2) and cover (3) from hous-
ing (4).
b.
Remove gasket (5) as required.
NOTE
Disassemble only as necessary
to replace faulty components.
3.
REMOVE CONTROL WIRING HARNESS.
a.
Tag wiring harness connectors
and mark tags for connector
positions on housing.
6-11