Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
INSTALLATION - TM-5-6115-634-14P_121
REPLACE FRONT STEP, CURBSIDE AND ROADSIDE
TM-5-6115-634-14P Power Plant AN/MJQ-16 (NSN 6115-00-033-1395) (2) MEP-002A 5 Kw 60 Hz Generator Sets M103A3 2-Wheel 2-Tire Modified Trailer Manual
Page Navigation
93
94
95
96
97
98
99
100
101
102
103
TM5-6115-634-14&P
NAVFAC P-8-647-14&P
T0-35C2-3-445-14
TM-6115-14&P/1
MAINTENANCE PULLER BRACKET
4-41.
REPLACE PULLER BRACKET
This task covers:
a. Inspection
b. Installation
INITIAL SETUP
Tools
General Mechanic’s Tool Kit
5180-00-177-7033
Materials/Parts
Bracket Puller
97403-13228E3387
Equipment
Conditions:
Reference
Para. 4-9 General Instructions.
REMOVAL
REMOVE PULLER BRACKET.
Remove two nuts with captive
washer (1) and screws (2).
Remove puller bracket (3) and
chain (4) from trailer curbside
front step (5).
INSTALLATION
INSTALL PULLER BRACKET.
Place puller bracket (3) over
mounting holes on curbside
front step (5).
Secure chain
(4) to left hand screw (2)
and Install two screws (2)
and nuts with captive washer
(1).
NOTE
FOLLOW ON MAINTENANCE: Connect
Negative Battery Cable (Para.
4-10) .
4-62
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business