Figure 5-8. Switch Box Switch Replacement.
Section I. GENERAL REQUIREMENTS

Power Plant An/Mjq-18 (Nsn 6115-00-033-1398) (2) Mep-003A 10Kw 60Hz Generator Sets M103A3 2-Wheel, 1-1/2 Ton Modified Trailer Page Navigation
  66    67    68    69    70  71  72    73    74    75    76  
img
. . .
ARMY TM 5-6115-633-14&P
(2) Installation.
(a) Position switch (6) on inside of cover (4). Insert four screws (13) with one flat washer
(14) and one preformed packing (15) each through cover and switch standoffs.
NOTE
Install nut (14) so that flat side mates with washer (15).
(b) Install one flat washer (15) and one nut (14) on end of each screw (13) and tighten.
(c) Position knob (12) on switch (6) and install screw (10) and Iockwasher (11).
NOTE
Observe identification bands on wires when reconnecting wires,
(d) Connect indicator light wires to switch (paragraph 4-25, b.(2)).
(e) Connect power cables to switch (paragraph 4-25, d.(2)).
(f) Connect load terminal wires to switch (paragraph 4-25, c.(2)).
(g) Position cover (4) on switch box (5) and secure with 16 screws (1), 16 lockwashers
(2) and 16 flat washers (3).
b. Power Cable and Wiring Repair. The switch box wiring is repaired by tightening or replacing
loose or damaged terminals. The power cables are repaired by replacing damaged terminals. The
repair parts and special tools list in this manual lists part numbers for the terminals. The replacement
terminals are soldered onto the wires in accordance with procedures given in TB SIG 222 (TO 31-3-
64) and TM 55-1500-323-25 (TO 1-1A-14).
5-13/(5-14 blank)