TM 5-6115-593-12
TO 35C2-3-463-1
STEP
5.
PRIOR TO CLOSING THE MAIN CIRCUIT BREAKER (AS EXPLAINED IN STEP 7, BELOW), CHECK GEN FAULT INDICATORS
AND ANNUCIATOR BY PLACING ANNUCIATOR TEST SWITCH IN THE TEST POSITION. IF NONE OF THE LIGHTS ARE ON
AFTER BEING TESTED PROCEED WITH STEP 6. IF A LIGHT DOES CONE ON. CORRECT THE INDICATED FAULT BEFORE
PROCEEDING.
STEP
6.
PLACE THE PARALLEL/SINGLE UNIT OPERATION SWITCH IN THE SINGLE UNIT OPERATION POSITION.
WARNING
PLACING AC PWR CKT BKR TO CLOSE APPLIES POWER TO OUTPUT LOAD TERMINALS AND LOAD
LINES. ENSURE ALL PERSONNEL ARE CLEAR OF OUTPUT LOAD TERMINALS. SERIOUS INJURY OR
DEATH COULD RESULT FROM CONTACT WITH THE OUTPUT VOLTAGES.
STEP
7.
PLACE THE AC PWR CKT BKR TO CLOSE POSITION FOR APPROXIMATELY 2 OR 3 SECONDS TO CLOSE THE MAIN CIRCUIT
BREAKER. CLOSED INDICATOR SHOULD COME ON.
Figure 2-6. Starting Instructions (Sheet 2 of 3)
2-16