TM 5-6115-585-34
NAVFAC P-8-623-34
TO 35C2-3-455-2
TM-05684C/05685B34
terminals; 2 red terminal covers for positive battery terminals
and 2 black terminal covers for negative battery terminals (as
listed in Table 10-1, item 8).
Reconnect cable clamps to battery
terminals.
Cover cable clamps with terminal covers (3).
(3)
Clear out acoustic fill from holes in left panel
assembly (2) using 3/8 inch diameter pin.
(4) Cut a 20 1/2 in. length and a 29 1/4 in. length
of adhesive backed teflon tape (as listed in Table 10-1, item 6).
Apply adhesive backed teflon tape to a clean top edge (surface
which will mount against top panel assembly) and left edge (edge
with three holes) of side closure assembly (4).
Use hand
pressure to remove air bubbles.
Clear teflon tape away from
screw holes.
(5)
Install left panel assembly (2) to side closure
assembly (4) with three screws (5), six washers (6 and 7) and
three locknuts (8) (as listed in table 10-1, item 8.b).
(6)
Torque screws (5) to 16 ±2 ft-lbs dry.
(7)
Locate left panel assembly (2) (with side closure
assembly (4) attached) on left support assembly (9) by aligning
captive nuts (10) in panel with holes in left support assembly
(9) .
Align side closure assembly mounting holes (11) with rear
closure assembly mounting holes (12).
(8)
Install left panel assembly (2) with side closure
assembly (4) to left support assembly (9) with four screws (13)
and four washers (14) and to rear closure assembly (15) with two
screws (16), four washers (17 and 18) and two locknuts (19) (as
listed in table 10-1, item 8.a. and item 6).
(9)
Torque screws (13) securing left panel assembly
(2) to left support assembly (9) to 18 ±2 in.-lbs dry.
(10) Torque screws (16) securing side closure assembly
(4) to rear closure assembly (15) to 16 ±2 ft.-lbs dry.
j.
Front Panel Assembly
(1)
Refer to figure 10-6 and clear out acoustic fill
from holes in front panel assembly (20) using 3/8 inch diameter
pin.
(2)
Install front panel assembly (20) to right panel
assembly (21) and left panel assembly (2) with six screws (22)
and six washers (23) (as listed in table 10-1, item 10).
Start
all screws by hand first.
(3)
Torque screws (22) to 18 ±2 in.-lbs dry.
Change 6
10-15