TM5-6115-584-34NAVFAC P-8-622-34TO 35C2-3-456-2TM 05682C-34b.Left(1)and lockwashersSupport Assembly.Refer to figure 10-2 to remove four screws (1)(2) securing access plate (3) to AC outputcontrol box assembly (4).(2)Cut a 50 in. length of adhesive backed teflontape (listed in Table 10-1, item 2).Apply adhesive backedteflon tape to a clean left support assembly top surface (surfacethat mounts against underside of skid frame).Use hand pressureto remove air bubbles.Clear teflon tape away from screw slots.(3)Loosen six existing screws (5) and slide leftsupport assembly (6) between skid (7) and bevel washers (8) asshown in figure 10-2, detail A.(4)Torque six existing screws (5) to 26 ±2 ft-lbsdry.(5)Refer to figure 10-2 to replace four screws (1)and lockwashers (2) which secure access plate (3) to AC outputcontrol box assembly (4).c.Rear Panel Assembly.CAUTI0NWhen drilling holes, careto damage fuel lines.(1)Refer to figure 10-1must be taken notdetail B and drill one 5/16inch guide hole (12) in generator set control cubicle supportframe (13) at location shown.(2) Using rear panel assembly (14) as template, aligndrilled guide hole (12) with bottom left rear panel assembly holeand mark location of three remaining holes in support frame (13).Drill three 5/16 inch holes.(3) Cut a 11 3/4 in. Length of adhesive backed teflontape (listed in Table 10-1, item 3).Apply adhesive backedteflon tape to clean right side surface of rear panel assembly(14) (surface with 2 captive nuts).Use hand pressure to removeair bubbles.Clear tape from captive nut openings.(4) Refer to figure 10-1 to install rear panel assem-bly (14) to generator set control cubicle support frame (13) withfour screws (15),eight washers (16 and 17) and four locknuts(18) (as listed in Table 10-1, item 3).(5) Torque screws (15) to 16 ±2 ft-lbs dry.10-6Change 6
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business