TM5-6115-584-34NAVFAC P-8-622-34TO 35C2-3-456-2TM 05682C-3410-3.PRELIMINARYPROCEDURES.Prior to ASK installation, perform the following procedures:a.When ASK installation is to be performed on trailermounted generator sets, ensure that generator set ground isconnected to trailer ground.b.Refer to Operator and Organizational MaintenanceManual, paragraph 4-17, and remove the grille from the engineblower housing.Store grille and attaching hardware at owningunits facility.10-4.ACOUSTICSUPPRESSIONKITINSTALLATION.a.Right Support Assembly.(1) Refer to Operator and Organizational MaintenanceManual paragraph 4-17, and remove shroud and blower housing.(2)Refer to figure 10–1 and locate right supportassembly (1) on skid (2).Align slots (3) in support assembly(1) with existing screw heads (4) and using support assembly (1)as template, mark the two additional mounting holes (5).(3)Drill two 7/16 inch holes (5) into skid (2) forright support assembly (1).(4)Cut a 50 in. length of adhesive backed teflontape (listed in Table 10-1, item 1).Apply adhesive backedteflon tape to a clean right support assembly top surface(surface that mounts against underside of skid frame). Use handpressure to remove air bubbles.Clear teflon tape away fromscrew slots.(5)Loosen four existing screws (4) and slide rightsupport assembly (1) between skid (2) and bevel washers (6) asshown in figure 10-1, detail A.(6)Install two each screws (7), washers (8), bevelwashers (9), lockwashers (10), and nuts (11) (as listed in Table10-1, item 1) in the two additional mounting holes (5).(7)Torque four existing screws (4) and the two addedscrews (7) to 26 ±2 ft-lbs dry.(8)Refer to Operator and Organizational MaintenanceManual, paragraph 4-17, and replace shroud and blower housing.10-4Change 6
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business