TM 5-6115-545-34(2) Adjust Set Point (R212) control to obtain rated(2) Perform checks in accordance with paragraph 16-11.voltage at generator output terminals.e. EquipmentTest.If the excitation assembly has beenb. Stability.Adjust R207 for optimum stability.replaced, repaired or adjusted refer to Chapter 16, Section II and—conduct the following tests.c.Gain.Adjust R211 for 14K ohms nominal.(1) Regulation range test. Refer to paragraph 16-14.d. ParallelAdjustmentProcedures-ReactiveLoadSharing.(2) Frequency and voltage regulation, stability and transient response test, short term. Refer to paragraph 16-15.(1) Connect an external load bank capable of loadingthe generator set to full load at 0.8 power factor.Section IV. LOAD MEASURING UNIT8-15. Scope.This section contains repair instructions for the loadmeasuring unit.8-16. Removal.See figure 8-1 and remove the load measuring unit (7) asfollows:a. Unscrew electrical connector.b. Remove screws (5) which secure load measuring unit(7) bottom of relay table (52).8-17. Disassembly,NOTETag all electrical leads removed duringdisassembly for positive identification duringreassembly.See figure 8-20 to disassemble the load measuring unit.8-18. Testing.a. Connect load measuring unit in test circuit as illus-trated in figure 8-21.b.With 120 volts on M3, no load on load bank (Rd), and 0volts indicated on voltmeter (M1), voltmeter (M2) shall in-dicate 0 to 0.4 Vdc. Resistor RI (17, fig. 8-20), internal toload measuring unit, may be adjusted to obtain thisreading.c.With load on Rd, and 5.6 volts ac indicated on Ml,voltmeter M2 shall indicate 9.4 to 9.8 Vdc.d. Select intermediate loads of Rd, and observe that the—voltage relationships indicated by Ml and M2 are identicalto the relationships indicated by the graph in figure 8-22.Adjust R1 to obtain this relationship.e.Replace a defective load measuring unit, if voltagerelationships do not match the graph.8-19. Repair, Reassembly and Installation.a. Repair. Replace load measuring unit that does notmeet testing requirements.b. Reassembly.See figure 8-20 and reassemble the load—measuring unit.c. Installation.See figure 8-1 and install the load meas-uring unit (7) on relay table (52) with screws (5).8-28Change 8
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business