T O 35C2-3-442-2
P-8-627-34
TM-07464A-35 TM 5-6115-457 -34
h. Prior to installing cover (11) check
13-27. WIRING HARNESS REBUILD. Re-
harness (51) wires and rear links (82) for
build dummy load kit control box harness as
proper connection.
i. Coat all solder connections with-
13-28. REASSEMBLY. Refer to figure
fungus resistant varnish conforming to
13-4 and reassemble control box assembly
Military Specification MIL-U-173B prior
in the reverse order of index numbers
to installing cover (n).
a s s i g n e d . Pay particular attention
to the following.
13-29. INSTALLATION. Refer to figure
a. Reassemble load dumping relay (45)
13-1 and install control box as follows.
NOTE
b. When installing links (79), set links
for desired voltage output, refer to
Control box cover must be
Operator and Organizational Maintenance
removed prior to installation.
Manual.
a. Position panel (62), firewall (61),
NOTE
and control box (63) on frame (70) and
Steps c. through g. deleted.
secure with screws (58) and washers (59
and 60).
NOTE
Dummy load bank wiring diagram is
contain in Operater and Organizational
Maintenance Manual.
b. Connect frame harness wires to
control box components. Check wires for
NOTE
proper connection.
Dummy load kit wiring diagram is
contain in Operator and Organiza-
c. Install cover (57) and secure switch
tional Maintenance Manual.
screws (54) and washers (55 and 56).
All data on pages 14-1 through 14-8,
including figures 14-1 and 14-2 deleted.
13-22
Change 8