T O 35C2-3-442-2
P-8-627-34
TM-07464A-35
TM 5-6115-457-34
12-8.
REASSEMBLY.
b. Prior to installing cover (2), refer
connection.
the electric winterization kit control box in
the reverse order of index numbers assign-
ed. Pay particular attention to the following:
c. After reassembly, test control box
a. Install connectors of harness (9) with
keyways on top.
12-9.
NOTE
INSTALLATION .
Refer to Operator and Organiza-
tional Maintenance Manual for
Refer to Operator and Organiza-
electric winterization kit wiring
tional Maintenance Manual and install the
diagram.
control box.
Section II. ELECTRIC HEATER
12-10.
GENERAL.
The electric heater is utilized to
cold weather operation. The heater con-
sists of a removable heating element,
intake head with integral check valve and
coolant tank. The check valve insures that
the coolant tank is always full and heating
element is submerged in coolant. The
heating element heats the coolant in the
tank which is in turn circulated through the
engine coolant system.
12-11.
REMOVAL.
Figure 12-5. Electric winterization kit
Refer to Operator and Organiza-
electric heater, exploded view
tional Maintenance Manual and remove the
electric heater.
1.
Screw
7. Intake head and
12-12.
DISASSEMBLY.
2.
Cover
check valve
End Plug
3.
assembly
8. Gasket
4.
Heating element
ble the electric heater in the order of index
9 . Tank
Screw (6)
5.
numbers assigned.
10. Plug
Washer (6)
6.
12-7
Change 8