P-9-TM-457-35 T.O. 35C2-3-442-2
TM-07464A-35 TM 5-6115-457-34
1.
19.
Nut (2)
Door holder (2)
20,
2.
Clamp (2)
Nut (6)
21.
Screw (6)
3.
Nut (2)
22.
4.
Screw (2)
Cross pin (3)
23.
5.
Nut
Stud (3)
6.
Screw
24.
Grommet (3)
7.
25.
Clamp
Control box door
8.
26.
Nut
Screw (6)
27.
9.
Terminal board jumper (3)
Screw
10.
28.
Nut (2)
Clamp
11.
29.
Insulator (3)
Screw (2)
12.
30.
Terminal board
Insulator (3)
31.
13.
Nut (4)
Rivet (6)
14.
Screw (4)
32.
Hinge
15.
33.
Spacer
Harness
34.
16.
Nut (2)
Rivet (6)
17.
35.
Washer (2)
Receptacle (3)
18.
Screw (2)
36.
Box
c. Repaired areas and those surfaces
on control box door (25), and thermal watt
requiring refinishing shall be cleaned with
a suitable abrasive paper, then primed and
box (36).
repainted.
c. Install harness (15) connector in
d. Re-stencil as required.
box (36) with key way on top. Connect
wires of harness to components, refer to
6-35. REBUILD. Rebuild the control
d. When installing clamp (2, figure
6-7) nearest control box door (25), leave
nut (1) loose enough to permit harness to
6-36. REASSEMBLY. Refer to figure
pivot when control box door is opened and
6-7 and reassemble control cubicle assem-
closed.
bly in the reverse order of index numbers
assigned. Pay particular attention to the
following:
6-38. INSTALLATION. Refer to para-
a. Install control box relay on rear
wall of box (36). Secure in position with
control cubicle assembly.
four nuts.
6-39. ADJUSTMENT. Refer to Operator
b. Refer to Operator and Organizational
and Organizational Maintenance Manual
Maintenance Manual and install components
and zero adjust all instruments.
6-13