P - 9 - T M - 4 5 7 - 3 5 T.O. 35C2-3-442-2
TM-07464A-35 TM 5-6115-457-34
18. Refer to Operator and Organiza-
defective or engine flywheel is not
tional Maintenance Manual and perform the
concentric.
following:
14. Install screen (4) and secure
(a) Install and adjust manual
with screws (3), washer (2), and nuts (1).
speed control.
allel receptacle wiring harness to rear
relay box and bracket assembly (28),
housing.
board assembly (20), bracket (16), cover
(c) Connect wiring harnesses to
(10), mode I or mode II relay box (6), and
fault locator, DC control circuit breaker,
exciter regulator and stowage box (3) in the
control cubicle, convenience receptacle,
reverse order of index numbers assigned.
exciter regulator, mode I or mode II relay
Pay particular attention to the following:
box, load measurement unit, tactical relay
box, precise relay box (on 50/60 hertz
NOTE
precise generator sets), and kit control
boxes, if installed.
For wire routing and termination,
refer to Operator and Organiza-
(d) Install air cleaner.
tional Maintenance Manual.
(e) Install rear basing cover
and generator compartment access doors.
transformers.
(f) Connect negative battery
cable.
(b) Connect relay box to reconnection
board wiring harness and generator leads to reconnection
ENGINE, D333C(T)
2-8.
board assembly. Secure reconnection board assembly to
skid base. Assure that generator leads are routed and
a. Removal. Remove the engine as
secured in a manner that no chaffing occurs.
follows:
1. Refer to Operator and Organiza-
(c) Connect relay box to recon-
nect on board harness to connector J41 of
tional Maintenance Manual and perform the
the load contactor, J61 of the generator,
following:
and terminal board TB2 located on trans-
(a) Drain fuel filter and strainer,
former assembly.
secondary fuel filter, day tank, radiator,
16. Position auxiliary fuel hose and
engine lubricating oil, and hydraulic tank
mount on skid base at left side of generator
on precise generator sets,
and secure with two screws and nuts.
(b) Disconnect negative battery
cable. Tag and disconnect cables from
upper side housings (5) and assembled rear
slave receptacle SR2, starter and starter
housing (14) in the reverse order of index
numbers assigned.
from skid base.
Change 7 2-11