• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
2-3.4  Connecting  Load.
2-4 INITIAL ADJUSTMENTS, CHECKS, AND SELF TEST. - TM-9-6115-660-13P_69

TM-9-6115-660-13P Power Plant Diesel Engine Driven 1-Ton Trailer Mounted (With Racks) 3Kw 60 Hz AN/MJQ-42 Manual
Page Navigation
  38    39    40    41    42  43  44    45    46    47    48  
TM  9-6115-660-13&P Figure 2-8. Switch Box Load Cable Connections. Table 2-3. Load Terminal Voltage. Generator Terminals Phase Voltage Output Reading 120/208V 3PH L1, L2 L1 - L2 3 PHASE 208 VOLTS L3, L0 L2 - L3 3 PHASE 208 VOLTS L3 - L1 3 PHASE 208 VOLTS L3 - L0 3 PHASE 120  VOLTS 120V 1PH L3  -L0 L3 - L0 1 PHASE 120  VOLTS 120/240V 1PH L3 - L1 L3 - L1 1 PHASE 240 VOLTS L3 - L0 L3 - L0 1 PHASE 120  VOLTS OR L1 - L0 L1  -L0  1  PHASE 120  VOLTS c. d. e. Using load terminal box wrench located in accessory box, loosen terminal nuts (5) on terminals (3) selected in step b. Insert ends of cables into slots of load terminal studs (3). Tighten load terminal nuts (5). 2-34







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.