• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Operator Preventive Maintenance Checks and Services - continued - TM-9-6115-660-13P_46
Operator Preventive Maintenance Checks and Services - continued - TM-9-6115-660-13P_48

TM-9-6115-660-13P Power Plant Diesel Engine Driven 1-Ton Trailer Mounted (With Racks) 3Kw 60 Hz AN/MJQ-42 Manual
Page Navigation
  17    18    19    20    21  22  23    24    25    26    27  
TM 9-6115-660-13&P Table 2-2.  Operator Preventive Maintenance Checks and Services - continued Location Item Interval Procedure Not Fully Mission No. Item to Capable if: Check/Service 5 Before TIRES a Check tires (9) for cuts, bruises, bulges, One tire is missing or unusual tread wear.  Remove any or unserviceable. foreign objects from between treads. b Check tire pressure when tires are cool, Tire will not hold as follows: air pressure. Power Plant Power Unit AN/MJQ-37    PU-798 AN/MJQ-38    PU-799 PU-798A PU-799A Highway 35 psi 35 psi (241.3 kPa) (241.3 kPa) (PU-798 AND PU-799) (PU-798A AND PU799A) (AN/MJO-37 AND AVMJQ-38) 6 Before WHEELS a Check wheels (10) for damage Wheel is damaged. b Check if stud nuts (11) are loose or One stud nut is missing loose or missing. WARNING Do   not   attempt   to   seat   a   lockring   when   tire   is   inflated.      Improperly   seated lockring could fly off.  Serious injury or death will result. c Model AN/MJQ-37 and AN/MJQ-38 Lockring not only, check for proper mounting of properly seated. wheel assembly lockring (12). Change 2  2-13







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.