TM 9-6715-668-13
5.
Use a screwdriver to push locking element (28) on auxiliary contractor K2 (35) in direction of arrow,
tilt auxiliary contractor K2 (35) upward and remove from mounting bar (38).
6.
Unlock semiconductor device V13 (29) by pushing in direction of arrow, and remove fromauxiliary
contractor K2 (35).
N O T E
Installation procedure for auxiliary contractor with semiconductor de-
vice K2 (35)/V13 (29), K4 (39)/V14 (40), K11 (49)/V7 (44), K12 (50)/V8 (45),
K14 (59)/V9 (46), K21 (57)/V12 (58), K23 (52)/V10 (59), K24 (53)/V11 (60)
Is the same as forauxiliary contractorK2 (27) with semiconductor de-
vice V13 (29) described below.
1 .
Hook top (37) of auxiliary contractor K2 (35) into mounting bar (38) and clip in at the bottom.
2.
Install semiconductor device V13 (29) on auxiliary contractorK2 (35) and clip into place.
CAUTION
Make sure polarity is correct when semiconductor device Is con-
nected.
3. Noting correct labeling and position, install cables (32) and cable (33) of semiconductor device V13
(29) to terminals (30) of auxiliary contractor K2 (35), and tighten screws (31).
4. Noting correct labeling and position, install cables (26) and cable (34) of semiconductor device V13
(29) to terminals (27) of auxiliary contractor K2 (35), and tighten screws (28).
5. Stow prop (5) and close front panel (4).
6. Close flap (2).
5-98