TM 9-6115-668-135.6 AUXILIARY CONTACTOR WITH SEMICONDUCTOR DEVICE MAINTENANCE.This task covers:a. Removalb. InstallationToolsEquipmentConditionsGeneral Mechanic’s Tool Kit(item 2, appendix B)Automotive Fuel and Electrical System Repair, Tool Kit(item 3, appendix B)Materials/PartsReferenceGenerator Set 150 kW shutdown,paragraph 2.5.2Cable ties(item 10, appendix E)WARNINGDisconnect the negative battery cable first and then the positive bat-tery terminal cables. Failure to observe this warning could result in se-vere personal injury or death.CAUTIONTag all cables prior to removal to ensure correct connection of thecables during installation.REMOVAL1.Open flap (2, figure 5-19) on unit hood assembly (1).2.Open front panel (4) on control cabinet assembly (3) and secure with prop (5).N O T ERemoval procedure or auxiliary contactor with semiconductor deviceK2 (35)/V13 (29), K4 (39)/V14 (40), K11 (49)/V7 (44), K12 (50)/V8 (45), K14(59)/V9 (46), K21 (57)/V12 (58), K23 (52)/V10 (59), K24 (46)/V11 (60) is thesame as for auxiliary contactor K2 (35) with semiconductor device V13(29), described below.3.Record labeling and position of cables (26) to auxiliary contactor K2 (35) and cable (34) to semicon-ductordevice V13 (29) at upper terminals (27), loosen screws (28), and remove cables (34) and (26).4 .Record labeling and position of cables (23) to auxiliary contractor K2 (35) and cable (33) to semi-conductor device V13 (29) at lower terminals (30) of auxiliary contractor K2 (35), loosen screws(31), and remove cables (32) and (33).5-97
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business